NYISO capacity expansion under a carbon tax

Result in one line

A $55 per ton carbon price reaches 70% renewables in an average year. Guaranteeing 70% in a poor resource year takes $120.

Context

Course
CEE 4880 capstone
Semester
Spring 2025
Team
Grace Raab, Jakobi Davis, Nick Norris
My part
Project lead. I ran the project from scope to final results and delivered most of the final presentation to the class and faculty.

Cornell academic work.

The problem

New York wants 70% of its power from renewables by 2030. A carbon tax is one way to push it there, but nobody had a clean answer for how high the tax needs to be. And a price that works in a normal weather year can come up short in a bad one.

So we asked two things. What price gets New York to 70% in a typical year? And what price holds it there when the wind and sun don't show up?

What we built

We built a capacity expansion model of the NYISO grid in AMPL: 11 zones, one year of data, fixed demand, and the existing transmission limits. The model picks what to build (solar, wind, gas, and 4-hour batteries, with existing nuclear kept on) to meet demand at the lowest cost.

We added a carbon tax to the objective and raised it in $5 steps until the grid hit 70%. Then we stress tested that price by scaling renewable output down 30% for a bad year and up 30% for a good one.

  • AMPL

What we found

  • Reaches 70% renewables, average year$55/t
  • Renewable share at $55/t, poor year56%
  • Guarantees 70% in a poor year$120/t

$55 a ton gets New York to 70% renewables in a normal year. Total system cost goes from $9.18 billion to $10.6 billion, about 15% more.

In a bad weather year, that same $55 only gets you to 56%. To hold 70% when the weather doesn't cooperate, you need $120 a ton. That's more than double.

Where it stops working

It's a model, not a forecast. It uses one year of data, fixed demand, and no new transmission or new nuclear, and the weather test scales every zone and hour by the same 30%. Change any of those and the numbers move.

We also saw transmission bottlenecks between upstate and downstate. New lines would likely lower the price needed, and this model doesn't build any.

Notes

The slider on the Models page runs on this project. Every $5 step from $0 to $55 is a real model run.